Loading...

32MW noor Abu Dhabi Seihan with Jinko Solar & EPC sterling & Wilsion(2020) -

32MW noor Abu Dhabi Seihan with Jinko Solar & EPC sterling & Wilsion(2020) -

Smart home As main contractor we have done all civil, mechanical & Electrical Works as - mentioned below.

1. DC Cable Excavation.
2. DC Cable laying with Testing & Commissioning
3. Installation of HDEP pipes.
4. Back filing DC Trench
5. Foundations for Inverters, transformers, RMU
6. Installation of Inverters, transformers, RMU with Testing & Commissioning 7. Installation of SCB including Electrical Connections
8. Installation of Structure
8. Installation of modules
9. Performing Electrical works at SCB & Inverters

10. Torqueing MMS
11. Alignment of MMS & modules

12. Earthing Works
13. Module Mapping
14. Installation of robots
15. WPS Installation
16. SCADA
17. MMS Bracing
18. Testing and commissioning